T: 905-738-6677

T: 905-738-6677

Home » Portfolios » Reconstruction of Thompson Road South

Reconstruction of Thompson Road South

General Contracting-Bid Build

Client:

Town of Milton

Location:

Britannia Road to Louis Saint Laurent Avenue, Thompson Road South, Milton

Contract Value:

$11.8m

Completion Date:

2021

2569_KAPP_June 4_Image 17


The project scope encompassed the reconstruction and widening of the road from Britannia Road to Louis Saint Laurent Avenue in the Town of Milton, along with the installation of both dry and wet utilities. The road was expanded from 2 lanes to 4 lanes, and the project included the construction of new intersections and a roundabout. Completed in three stages, the project required careful planning to ensure continuous access to the various business facilities surrounding the site throughout the construction period.


Despite numerous challenges, the dedication, expertise, and professionalism of our team enabled the smooth execution of the project without impacting the schedule. Although the project commencement was delayed due to the unavailability of the work front, our superior project management capabilities ensured the project was completed within the stipulated timeframe. Additionally, we effectively navigated unprecedented challenges posed by the COVID-19 pandemic, including supply chain disruptions and the need for special operating protocols. This accomplishment reflects our commitment to delivering excellence even in the face of adversity.

2569_KAPP_June 4_Image

Discover your next opportunity with KAPP

Shopping Basket
Skip to content